tunnel Overview of China’s Rock Drilling Jumbos for Tunnels This paper gives the definition of the rock drilling jumbo for tunnel and describes China's manufacturers of rock drilling jumbos for tunnel and models of their products. The rock drilling jumbos are divided into 2 classes herein: jumbos with the usage report and jumbos without the usage report.
high-speed railway tunnel Application of Mechanized Construction Method to Large Cross-sectional Tunnel with Soft Surrounding Rocks The construction technology of mountain tunnel in China is under-developed. Hence,the mechanized construction method for large cross-sectional tunnel on high-speed railway is introduced. A new kind of tunnel construction organization mode with four tunnel construction lines,i.e. excavation,support
tunnels Application Research and Analysis of Three-arm Drilling Trolley in Sanleng Mountain Tunnel Three-arm drilling trolley is the most advanced special equipment for mountain drilling and drilling technology,especially for soft and broken geological tunnel. In this paper,taking Sanleng mountain tunnel for example,for the characteristics of tunnel surrounding rock more broken,excavation section
parts search 3128306955 Brand : EPIROCPart No. : 3128306955Description : BoltUse in : Boomer 281 , Boomer 281dh , Boomer 282 , Boomer 353 , Boomer K111 , Boomer L2c , Boomer L2d , Boomer M2c , Boomer M2d , Boomer S1d , Boomer S2 , Boomer Xl3 , Simba H1257 , Simba S7d
drilling rig Application and Analysis of Rock Drill Car in the Construction of Mountain Tunnel In the process of mountain tunnel construction, drilling and blasting method is a commonly used tunneling technology. With the increasing demand of tunnel construction, the country pays more and more attention to the construction safety. Drilling bench has gradually become the necessary
Sandvik Introduction to Specifications of Hydraulic Rock Drills from Sandvik Group Company Since its acquisition of Tamrock based in Finland in the 1990s, Sandvik, a large-scale multinational company, also possessed Tamrock’s hydraulic rock drills business. Hydraulic rock drills from Tamrock had been the largest competitors of those from Atalas. The paper covered relevant
Hydraulic rock drill Measures Taken for Manufacturing Process for TAY Series Hydraulic Rock Drills The paper lists some problems existing in the production and application of TAY series hydraulic rock drills as well as their respective solutions. It can be used as a reference for the production of the hydraulic rock drills in the sector.
full-hydraulic drilling jumbo Outline of Development of Full-Hydraulic Drilling Jumbo The paper covered the status quo of the development of full-hydraulic drilling jumbos in China and outlined features of their products from the major domestic drilling jumbo manufactures.
high-speed railway tunnel Application of Triple-boom Rock Drilling Jumbo to Weak Surrounding Rock Construction of Zhengzhou-Wanzhou High-speed Railway Tunnel In order to ensure the safety and quality of the construction of Zhengzhou-Wanzhou high-speed railway tunnel and shorten the construction schedule of the tunnel,the large cross-section construction method by triple-boom rock drilling jumbo is put forward.And then proper transformations for the jumbo
parts search 3128315027 Brand : EPIROCPart No. : 3128315027Description : StopUse in : Simba H1257 , Simba S7d
Hydraulic rock drill Introduction to Specifications of Non-Open-Pit Hydraulic Rock Drills from Eprioc Group Company Eprioc Group Company,an emerging company which is split from Sweden’s Atlas Copco,has independent businesses. The family of hydraulic rock drills features complete types and appropriate classification. In this paper,specifications of non-open-pit hydraulic rock drills such as the anchor drilling rig
three-arm drilling rig Technology for Reinforcing Tunnel Face Using Three-arm Drilling Rig Combining with Fiberglass Bolt In the past days,while encountering bad geological conditions such as fault fracture zone or karst in rock class Ⅳ and Ⅴ sections,the traditional treatment method for tunnel is applying pipe roof and forepoling ducts first,then grouting those pipes and ducts to improve the tunnel stability