underground mines Underground Mining Technology and its Trend Analysis continuous development of China's scientific and technological level, there has been a qualitative leap in underground mining technology. At present, in order to strengthen the mining efficiency of underground metal mines in China, it is necessary to strengthen research on underground mining
Hydraulic rock drill Fracture Failure Analysis of Shank Adapter for Hydraulic Rock Drill The shank adapter of hydraulic rock drill broke after drilling 4000 m. Failure analysis is conducted using fracture morphology observation, chemical composition, mechanical properties and microstructure analysis. The results show that the material of shank adapter has well wear resistance and
Rock drilling tool The Processing Technology of Hot Embedded Tooth Drill Body for Rock Drilling Tool This paper mainly analyzes the processing technology of the hot embedded tooth drill body, that is, the machining process and the heat treatment process. By selecting the reasonable materials and processing through a series of steps, and through a large number of comparative experiments, it is
parts search 3128078258 Brand : EPIROCPart No. : 3128078258Description : Cradle PlateUse in : Boomer 104 , Boomer 281 , Boomer 281dh , Boomer 282 , Boomer K111 , Boomer K41 , Boomer K41x , Boomer S1d , Simba H157
High-speed railway Analysis of Mechanized Construction Technology for High-Speed Railway Tunnel In this paper, the mechanized construction technology for high-speed railway tunnel is comprehensively analyzed. Through the introduction of advanced mechanical equipment and technology, such as full computer three-arm drilling rig, long-span telescopic mobile treble, etc., multiple improvements
tunnel blasting Development status and trends of railway tunnel blasting technology in China A large number and long mile age of railway tunnels are being constructed in China. Thedrilling and blasting technology has be come the most commonly used method in the tunnel construction process due to its unique advantages. The blasting is not only the first stage of tunnel excavation,but also
Hydraulic rock drill Analysis and Improvement Measures of Cracking Failure of Shank Bushing The 4Cr5Mo2V shank adapter for a hydraulic rock drill drill machine cracked after 10 days of use. Through the observation of fracture morphology, chemical composition analysis, mechanical properties and metallographic structure test, the causes of cracking of 4Cr5Mo2V shank bushing were
roads Large-scale Mechanized Construction Technology of Full-section Drilling and Blasting of Extra-long Highway Tunnel The construction of an extra-long and large cross-section highway tunnel is the key for entire construction period in expressway. To ensure construction quality and improve construction progress, the principles for supporting large-scale mechanized equipment, such as matching with geological
Hydraulic rock drill Fracture Analysis of 20CrNi3 Shank Adapter for Hydraulic Rock Drill The 20CrNi3 shank adapter for hydraulic rock drill was fractured after drilling for 300 meters.The fracture causes of 20CrNi3 shank adapter were analyzed through chemical composition analysis,fracture morphology and microstructure observation,mechanical properties testing. The results showed
parts search 86611639 Brand : MONTABERTPart No. : 86611639Description : Hydraulic Stop PistonUse in : Hc 109 , Hc 150
highway Application of Large-scale Mechanized Whole-process Operation Technology for Large-section Tunnels In view of the characteristics of two-way eight-lane and single-hole four-lane large-section tunnel construction of expressway, the application of large-scale mechanized full-process operation technology is studied. Through the use of advanced geological prediction technology, the condition of the
plateau railway Research on the Application of Large-scale Mechanization in Drilling and Blasting Construction of Plateau Railway Tunnels In order to further improve the level of large-scale mechanized construction of plateau railway tunnels, reduce construction risks, and ensure the construction progress, combined with the characteristics and construction requirements of the surrounding rock of plateau tunnels, the application